watermark logo

Up next

Nairobi Expressway tour and opening date

0 Views· 11/23/23
Boina123
Boina123
2 Subscribers
2

Nairobi Expressway tour and opening date | #254NEWSFEEDS

Description
The Nairobi expressway has had 95% of its roadwork finished. With the contractor's assurances that the road will open in April, the Kenyan National Highways Authority says it is working on toll costs that will be announced to the public soon, as final preparations are being made to the expressway ahead of its opening.

Finishing touches are being conducted on the 65 billion shilling road project, which is intended to minimize traffic along the congested Waiyaki way and Mombasa roads as its inauguration date approach. The expressway's hard infrastructure has been finished for the most part. Here's a demonstration of how the tolling stations will work.

According to KENHA, they're working on pricing for toll booths. Costs that were published in a section of the newspapers were dismissed, with the company stating that they plan to adjust the rates before the April launch date. There will be 11 interchanges and 27 toll booths along the new 27-kilometer highway. The expressway is planned to reduce the amount of time it takes to travel between Westlands, the city's furthest point, and Jomo Kenyatta International Airport.

Thousands of Kenyans travel between the east and west sides of Nairobi by way of Mombasa Road and Waiyaki Way. They will benefit from the highway once it is built. As you can see, traffic is already backed up on the old road. However, the drive between Westlands, where the highway begins, and Mlolongo, where the expressway finishes, took us 15 minutes.

The road is not operating yet, according to KENHA, and they are merely doing test drives with their employees to measure traffic flow until the route is opened. The administration also states that the original infrastructure that was harmed during the construction of the highway would be repaired when the road is completed. After the road is completed, the developer will manage it for the following 30 years to repay the investment before handing it back to the Kenyan government...

Key points in this video
This video is about Nairobi expressway, Nairobi expressway project, Nairobi express way, Nairobi expressway plan, express way Nairobi plan, Nairobi expressway construction, the Nairobi express way.

Also covers Kenya News, KTN Kenya, KTN News Kenya, KTN, Citizen TV Kenya, Citizen Kenya, NTV Kenya, live news, Uhuru Kenyatta, William Ruto, Raila Odinga, Nairobi news, Nairobi, the standard, live stream, live events, breaking news, USA, America, diaspora, trending, videos, news, politics, entertainment, Eric Omondi, Stream NTV, Stream Citizen, Livestream CITIZEN TV, watch live citizen TV, Sautisol, Otile Brown, Citizen Nipashe,

Article and Videos sources:


About 254 NEWS FEEDS
Welcome to the 254 NEWS FEEDS channel! Whether you are looking for the most reliable source of information on education, entertainment, music, lifestyle, celebrities, society, humor, debate, drama, facts, and current affairs, or want to stay informed about all the trends of East Africa and the world, you have come to the right place. We believe that everyone should have easy and clear access to information and that video is a powerful educational tool, fostering awareness and keeping records of big and small events in the world. Read new information from our authors. Don't forget to sign up and tap the alarm icon to get the latest information as we publish.

Key points in this channel
This video deals with 254NewsFeed, entertainment, lifestyle, celebrities, News54, Society, politics, information, Kenya, Humor, youtube, Controversial, Drama, Facts, Education, current affairs, #KenyaNews, News254, #trending today people and blogs.

Social Media Handles
Youtube Channel Link: https://bit.ly/3udQ6z3

Facebook Page: https://bit.ly/3qm9hp6

Twitter Handle: https://bit.ly/3IudMV0

Show more


 0 Comments sort   Sort By


Up next